El logo tiene la palabra 'ABUND' en letras grandes, con una ilustración de una rama de hojas en dorado que cruza por la letra U.

A place that once you come to, you will always be eager to return. This will be your oasis which is located in the vibrant epicenter of the city, a few steps from Fifth Avenue and the most iconic restaurants, markets and shops. Immerse yourself in the modernity of Tohoku, just off 38th Street, one of the avenues with ever-rising property values in the area.

Habitación moderna con cama grande, ropa de cama en tonos tierra, paredes de madera y una ventana grande con cortinas transparentes, decorada en tonos neutros con una pintura en la pared y plantas verdes en el lado izquierdo.

TYPOLOGY 1

  • 75.19m²

  • 1

  • 1

  • FROM $4.830.720 MXN

    • MAYA STONE

    • COP CHUKUM CORAL

    • COP CEMENTO APARENTE

    • PAROTA (Mix Of Tzalam & Teka)

    • PALOS DE JILES

    • CEMENT LATTERING (STRNG C-14 Color old pink)

    • BLACK ALUMINUM, RUG (Yute)

    • MARBLE (Natural tavertino)

    • RAW STONE

    • LINEN CURTAINS

  • FRONT APARTMENT

CONTACT FOR MORE INFO

TYPOLOGY 2

  • 75.737m²

  • 1

  • 1

  • FROM $5.150.116 MXN

    • MAYA STONE

    • COP CHUKUM CORAL

    • COP CEMENTO APARENTE

    • PAROTA (Mix Of Tzalam & Teka)

    • PALOS DE JILES

    • CEMENT LATTERING (STRNG C-14 Color old pink)

    • BLACK ALUMINUM, RUG (Yute)

    • MARBLE (Natural tavertino)

    • RAW STONE

    • LINEN CURTAINS

  • BACK APARTMENT

CONTACT FOR MORE INFO
Interior de un espacio moderno de estilo rústico, con muro y suelo de piedra, jacuzzi al lado, plantas verdes altas, sillón con cojines y espacio de comedor visible a través de paredes de cristal.

TYPOLOGY 3

  • 96.320 m²

  • 1

  • 1

  • FROM $7.512.960 MXN

    • MAYA STONE

    • COP CHUKUM CORAL

    • COP CEMENTO APARENTE

    • PAROTA (Mix Of Tzalam & Teka)

    • PALOS DE JILES

    • CEMENT LATTERING (STRNG C-14 Color old pink)

    • BLACK ALUMINUM, RUG (Yute)

    • MARBLE (Natural tavertino)

    • RAW STONE

    • LINEN CURTAINS

  • BACK APARTMENT WITH POOL

CONTACT FOR MORE INFO
Sala moderna con sofá beige, mesa de comedor de madera con sillas, plantas grandes en macetas, pared de piedra decorativa y luminarias colgantes de fibra natural.

TYPOLOGY 4

  • 95.495m²

  • 2

  • 2

  • FROM $6.493.660 MXN

    • MAYA STONE

    • COP CHUKUM CORAL

    • COP CEMENTO APARENTE

    • PAROTA (Mix Of Tzalam & Teka)

    • PALOS DE JILES

    • CEMENT LATTERING (STRNG C-14 Color old pink)

    • BLACK ALUMINUM, RUG (Yute)

    • MARBLE (Natural tavertino)

    • RAW STONE

    • LINEN CURTAINS

  • FRONT APARTMENT

CONTACT FOR MORE INFO

TYPOLOGY 5

  • 99.645m²

  • 2

  • 2

  • FROM $6.775.860 MXN

    • MAYA STONE

    • COP CHUKUM CORAL

    • COP CEMENTO APARENTE

    • PAROTA (Mix Of Tzalam & Teka)

    • PALOS DE JILES

    • CEMENT LATTERING (STRNG C-14 Color old pink)

    • BLACK ALUMINUM, RUG (Yute)

    • MARBLE (Natural tavertino)

    • RAW STONE

    • LINEN CURTAINS

  • BACK APARTMENT

CONTACT FOR MORE INFO
Sala de estar moderna con televisión en la pared, sofá beige, planta en maceta grande y vista a un balcón con cortinas blancas y palmeras exteriores.

TYPOLOGY 6

  • 124.100m²

  • 2

  • 2

  • FROM $9.679.800 MXN

    • MAYA STONE

    • COP CHUKUM CORAL

    • COP CEMENTO APARENTE

    • PAROTA (Mix Of Tzalam & Teka)

    • PALOS DE JILES

    • CEMENT LATTERING (STRNG C-14 Color old pink)

    • BLACK ALUMINUM, RUG (Yute)

    • MARBLE (Natural tavertino)

    • RAW STONE

    • LINEN CURTAINS

  • BACK APARTMENT WITH POOL

CONTACT FOR MORE INFO
Sala moderna con sofá beige, planta grande, televisor en la pared, ventana grande con vista al mar, cortinas blancas, decoraciones de madera y plantas en el interior.

TYPOLOGY 7

  • 119.950m²

  • 3

  • 3

  • FROM $8.156.600 MXN

    • MAYA STONE

    • COP CHUKUM CORAL

    • COP CEMENTO APARENTE

    • PAROTA (Mix Of Tzalam & Teka)

    • PALOS DE JILES

    • CEMENT LATTERING (STRNG C-14 Color old pink)

    • BLACK ALUMINUM, RUG (Yute)

    • MARBLE (Natural tavertino)

    • RAW STONE

    • LINEN CURTAINS

  • FRONT APARTMENT

CONTACT FOR MORE INFO
Comedor elegante con mesa de madera, platos, copas y cubiertos, rodeado de sillas de madera y una sala con sofá y plantas.

TYPOLOGY 8

  • 124.084m²

  • 3

  • 3

  • FROM $8.437.712 MXN

    • MAYA STONE

    • COP CHUKUM CORAL

    • COP CEMENTO APARENTE

    • PAROTA (Mix Of Tzalam & Teka)

    • PALOS DE JILES

    • CEMENT LATTERING (STRNG C-14 Color old pink)

    • BLACK ALUMINUM, RUG (Yute)

    • MARBLE (Natural tavertino)

    • RAW STONE

    • LINEN CURTAINS

  • BACK APARTMENT

CONTACT FOR MORE INFO

TYPOLOGY 9

  • 195.140m²

  • 4

  • 3

  • FROM $13.269.520 MXN

    • MAYA STONE

    • COP CHUKUM CORAL

    • COP CEMENTO APARENTE

    • PAROTA (Mix Of Tzalam & Teka)

    • PALOS DE JILES

    • CEMENT LATTERING (STRNG C-14 Color old pink)

    • BLACK ALUMINUM, RUG (Yute)

    • MARBLE (Natural tavertino)

    • RAW STONE

    • LINEN CURTAINS

  • BACK APARTMENT WITH POOL

CONTACT FOR MORE INFO

FOLLOW OUR CONSTRUCTION PROGRESS

LAND CLEARING

December 2024

In October 2024, the land for our upcoming project was cleared and prepared for construction. This initial phase involved the removal of vegetation, debris, and surface leveling, ensuring the site was ready for the structural groundwork to begin. Proper site preparation was essential to establish a solid foundation for the smooth progression of the construction process.

Following the land clearing, the excavation phase was carried out to prepare for the foundation work. This process included digging to the required depth and shaping the site according to the structural plans. The excavation marked a crucial milestone, setting the stage for the installation of the reinforced concrete elements that would support the building’s structure.

EXCAVATION

January 2025

FOUNDATION SLAB

February/ May 2025

We continue to make progress with the preparation of the foundation slab, placing a sheet of high-density black polyethylene on the ground. This material allows us to create an effective moisture barrier, preventing groundwater from rising and compromising both the concrete and interior finishes. This sheet helps us retain the necessary hydration during the concrete's curing, which improves its final strength and reduces the risk of early cracking. It also prevents the concrete from being contaminated by soil or impurities and protects the steel bars from corrosion.

We placed the steel bars in the diameters required by the structural calculations. They form part of the main reinforcement grid that reinforces the slab, designed to support the building's loads, the weight of the walls and columns, potential ground settlements, and seismic events. This entire process is part of our commitment to a solid, safe, and durable foundation for ABUND and is a key step in the overall progress of the Tohoku Living development.

SNEAK PEEK!

Major milestone on the ABUND project: foundation cementing successfully completed. This marks the end of groundwork and the start of vertical construction.

The first foundation of the ABUND project was completed successfully, marking a key milestone in the early stages of construction. This phase involved pouring reinforced concrete over the previously excavated and prepared ground, establishing a solid base that will support the structure’s vertical elements. The execution of this foundational work reflects our commitment to quality and long-term structural integrity from the very beginning.

FOUNDATION PHASE 1

June / July 2025

POURING OF STRUCTURAL COLUMNS & THE MAIN CISTERN-FOUNDATION

August 2025

We’ve advanced with the pouring of structural columns and the main cistern—key elements for the project’s strength and functionality.

The reinforced concrete columns provide stability and safety, while the cistern ensures an efficient and reliable water supply for the community. Each stage reinforces our vision: a high-quality development designed to experience the Caribbean with comfort and confidence.

POURING OF WALLS AND COLUMNS

August 2025

At this stage, the pouring of structural walls and columns was carried out using high-strength ready-mix concrete. Mechanical vibration procedures were applied to ensure proper compaction and prevent the formation of voids. In addition, special attention was given to the correct alignment and verticality of the elements, ensuring compliance with structural parameters and the required quality for the continuity of the project.

SNEAK PEEK!

Major milestone on the ABUND project: foundation cementing successfully completed. This marks the end of groundwork and the start of vertical construction.

STRUCTURAL PROGRESS, MASONRY & FINISHES ELECTROMECHANICAL INSTALLATIONS & VERTICAL MOBILITY SYSTEMS

Sep - Oct - Nov Quarter 2025

The construction of walls, columns, beams, and slabs was completed to high quality and safety standards, ensuring strong structural integrity for the next above-ground stages. Work also included plastering, wall alignment, and technical finishes in service and circulation areas, preparing optimal conditions for the upcoming phases.

Hydraulic, sanitary, and electrical systems were installed across both basement levels, ensuring efficient and coordinated underground infrastructure. Passenger and vehicle elevators were also installed and are now being integrated into the project’s electromechanical systems.

your home in the Caribbean is already

your home in the Caribbean is already