A place that once you come to, you will always be eager to return. This will be your oasis which is located in the vibrant epicenter of the city, a few steps from Fifth Avenue and the most iconic restaurants, markets and shops. Immerse yourself in the modernity of Tohoku, just off 38th Street, one of the avenues with ever-rising property values in the area.
TYPOLOGY 1
-
75.19m²
-
1
-
1
-
FROM $4.830.720 MXN
-
MAYA STONE
COP CHUKUM CORAL
COP CEMENTO APARENTE
PAROTA (Mix Of Tzalam & Teka)
PALOS DE JILES
CEMENT LATTERING (STRNG C-14 Color old pink)
BLACK ALUMINUM, RUG (Yute)
MARBLE (Natural tavertino)
RAW STONE
LINEN CURTAINS
-
FRONT APARTMENT
TYPOLOGY 2
-
75.737m²
-
1
-
1
-
FROM $5.150.116 MXN
-
MAYA STONE
COP CHUKUM CORAL
COP CEMENTO APARENTE
PAROTA (Mix Of Tzalam & Teka)
PALOS DE JILES
CEMENT LATTERING (STRNG C-14 Color old pink)
BLACK ALUMINUM, RUG (Yute)
MARBLE (Natural tavertino)
RAW STONE
LINEN CURTAINS
-
BACK APARTMENT
TYPOLOGY 3
-
96.320 m²
-
1
-
1
-
FROM $7.512.960 MXN
-
MAYA STONE
COP CHUKUM CORAL
COP CEMENTO APARENTE
PAROTA (Mix Of Tzalam & Teka)
PALOS DE JILES
CEMENT LATTERING (STRNG C-14 Color old pink)
BLACK ALUMINUM, RUG (Yute)
MARBLE (Natural tavertino)
RAW STONE
LINEN CURTAINS
-
BACK APARTMENT WITH POOL
TYPOLOGY 4
-
95.495m²
-
2
-
2
-
FROM $6.493.660 MXN
-
MAYA STONE
COP CHUKUM CORAL
COP CEMENTO APARENTE
PAROTA (Mix Of Tzalam & Teka)
PALOS DE JILES
CEMENT LATTERING (STRNG C-14 Color old pink)
BLACK ALUMINUM, RUG (Yute)
MARBLE (Natural tavertino)
RAW STONE
LINEN CURTAINS
-
FRONT APARTMENT
TYPOLOGY 5
-
99.645m²
-
2
-
2
-
FROM $6.775.860 MXN
-
MAYA STONE
COP CHUKUM CORAL
COP CEMENTO APARENTE
PAROTA (Mix Of Tzalam & Teka)
PALOS DE JILES
CEMENT LATTERING (STRNG C-14 Color old pink)
BLACK ALUMINUM, RUG (Yute)
MARBLE (Natural tavertino)
RAW STONE
LINEN CURTAINS
-
BACK APARTMENT
TYPOLOGY 6
-
124.100m²
-
2
-
2
-
FROM $9.679.800 MXN
-
MAYA STONE
COP CHUKUM CORAL
COP CEMENTO APARENTE
PAROTA (Mix Of Tzalam & Teka)
PALOS DE JILES
CEMENT LATTERING (STRNG C-14 Color old pink)
BLACK ALUMINUM, RUG (Yute)
MARBLE (Natural tavertino)
RAW STONE
LINEN CURTAINS
-
BACK APARTMENT WITH POOL
TYPOLOGY 7
-
119.950m²
-
3
-
3
-
FROM $8.156.600 MXN
-
MAYA STONE
COP CHUKUM CORAL
COP CEMENTO APARENTE
PAROTA (Mix Of Tzalam & Teka)
PALOS DE JILES
CEMENT LATTERING (STRNG C-14 Color old pink)
BLACK ALUMINUM, RUG (Yute)
MARBLE (Natural tavertino)
RAW STONE
LINEN CURTAINS
-
FRONT APARTMENT
TYPOLOGY 8
-
124.084m²
-
3
-
3
-
FROM $8.437.712 MXN
-
MAYA STONE
COP CHUKUM CORAL
COP CEMENTO APARENTE
PAROTA (Mix Of Tzalam & Teka)
PALOS DE JILES
CEMENT LATTERING (STRNG C-14 Color old pink)
BLACK ALUMINUM, RUG (Yute)
MARBLE (Natural tavertino)
RAW STONE
LINEN CURTAINS
-
BACK APARTMENT
TYPOLOGY 9
-
195.140m²
-
4
-
3
-
FROM $13.269.520 MXN
-
MAYA STONE
COP CHUKUM CORAL
COP CEMENTO APARENTE
PAROTA (Mix Of Tzalam & Teka)
PALOS DE JILES
CEMENT LATTERING (STRNG C-14 Color old pink)
BLACK ALUMINUM, RUG (Yute)
MARBLE (Natural tavertino)
RAW STONE
LINEN CURTAINS
-
BACK APARTMENT WITH POOL




FOLLOW OUR CONSTRUCTION PROGRESS
LAND CLEARING December 2024
In October 2024, the land for our upcoming project was cleared and prepared for construction. This initial phase involved the removal of vegetation, debris, and surface leveling, ensuring the site was ready for the structural groundwork to begin. Proper site preparation was essential to establish a solid foundation for the smooth progression of the construction process.



Following the land clearing, the excavation phase was carried out to prepare for the foundation work. This process included digging to the required depth and shaping the site according to the structural plans. The excavation marked a crucial milestone, setting the stage for the installation of the reinforced concrete elements that would support the building’s structure.
EXCAVATION January 2025













FOUNDATION SLAB
February/ May 2025
We continue to make progress with the preparation of the foundation slab, placing a sheet of high-density black polyethylene on the ground. This material allows us to create an effective moisture barrier, preventing groundwater from rising and compromising both the concrete and interior finishes. This sheet helps us retain the necessary hydration during the concrete's curing, which improves its final strength and reduces the risk of early cracking. It also prevents the concrete from being contaminated by soil or impurities and protects the steel bars from corrosion.
We placed the steel bars in the diameters required by the structural calculations. They form part of the main reinforcement grid that reinforces the slab, designed to support the building's loads, the weight of the walls and columns, potential ground settlements, and seismic events. This entire process is part of our commitment to a solid, safe, and durable foundation for ABUND and is a key step in the overall progress of the Tohoku Living development.















The first foundation of the ABUND project was completed successfully, marking a key milestone in the early stages of construction. This phase involved pouring reinforced concrete over the previously excavated and prepared ground, establishing a solid base that will support the structure’s vertical elements. The execution of this foundational work reflects our commitment to quality and long-term structural integrity from the very beginning.
FOUNDATION PHASE 1
June / July 2025














SNEAK PEEK!
Major milestone on the ABUND project: foundation cementing successfully completed. This marks the end of groundwork and the start of vertical construction.